This is a photo of the steep trail after the re-route took it away from the drainage point and utilized existing rocks as steps. A few tree branches were trimmed from the pine tree and some dead fall was used to "blockade" the existing trail. Time will tell if this becomes a more effective trail at mitigating erosion.